New multi-use courts to come for Frankston South and Carrum Downs
As part of the delivery of the Frankston Play Strategy, construction will begin on two new multi-use courts at Lavender Hill Reserve, Carrum Downs, and Pratt Reserve in Frankston South, in early 2024.
Each court will include:
- Basketball hoop with noise reduction backboard
- Netball hoop
- Court line markings to international basketball (FBA)and Netball Victoria standards
- Handball line marking
At Lavender Hill Reserve the court replaces the existing one but will be in a more central location, away from nearby homes. And the old court area will be replanted with grass, along with more trees in the reserve.
We know everyone loves to enjoy their local reserves in summer, but the works need to happen in the summer months as we need high temperatures for the acrylic surface to dry. Only parts of each reserve will be closed during the works.
They are expected to be completed in March/April (weather permitting). Get your game on!
Find out about other play space upgrades at Let's Play! | Engage Frankston!